Home » Project

City Network Renewal

The YB-12/0.4 prefabricated substation shortened the construction period in the old city by 40%. Intelligent monitoring ensures 24-hour stable power supply, earning it a designation as a demonstration project.

Industrial Green Power

The ZCRM6-12 ring main unit with combination switches enables grid connection and intelligent distribution of photovoltaic power plants, reducing annual losses by 2 million yuan and setting a green benchmark.

Hub Power Supply

The ZW32-12 circuit breaker with triple protection ensures power supply for millions of passengers during the Spring Festival travel rush, achieving zero failures and becoming a model for hub power supply.

ABOUT

PRODUCTS

QUICK LINKS

CONTACT

ADD: No. 29, Binjiang South Third Road, Leqing Economic Development Zone, Yueqing City, Wenzhou City, Zhejiang Province, China.
 +86-137-7779-3406
    +86-151-6877-1252
Copyrights 2025 Zhejiang Zhouchi Electric Co., Ltd. All rights reserved.